E105 Gjønnes tunnel

We are building 1,500 meters of the total 1,950-meter-long twin-tube Gjønnes tunnel, which connects Gjønnes to the E18 at Strand and further to the Fornebu area in Oslo.

Basic information

  • Client: Statens Vegvesen
  • Main contractor: OHLA Norge
  • Contractor: Metrostav Norge AS
  • Construction time period: 07/2025 – 10/2027
  • Price: 440 649 000 NOK excluding VAT

Project characteristics

The Gjønnes tunnel is a new connection between Gjønnes and the E18 at Strand with a further connection to Fornebu in Oslo area.

The tunnel is a double tube tunnel with a profile of T9.5. Contract E105 will build approx. 1500 m of the total approx. 1950 m long tunnel. The remaining approx. 450 m will be carried out by E102 contract.

Project data

2 pcs, total 3 000 m
Tunnels:
T9,5, ca 80 m2
Tunnel profile:
261 340 m3
Blasting in tunnels:
12 030 m3
Sprayed concrete:
18 150 pcs
Bolts:
5 306 000 kg
Cement grouting:

Challenges / Specifics of the project

  • High requirements for work and environmental safety and quality
  • Coordination with the contractors of other sections of the tunnel
  • Strict grouting criteria