- Main client: Møre og Romsdal Fylkeskommune
- Contractor: Partnership Metrostav Norge AS and Bertelsen&Garpestad AS
- Construction period: 11/2022 – 03/2025
- Price: 442 277 896 NOK excluding VAT
Fv. 5878 Nye Nerlandsøybrua
Basic information
Project characteristics
The Fv. 5878 Nye Nerlandsøybrua project includes the construction of a new bridge between the isles of Nerlandsøya and Bergsøya, located southwest of Ålesund.
The bridge is a reinforced concrete structure with a total length of 574 m and width of 11,5 m, divided into 8 spans, with the main span being 140 m long. The main part of the bridge will be built using the free cantilever method, and the other parts using a movable scaffolding system.
The project also includes the construction of sea embankments and the laying of the bridge foundation using large diameter bored piles.
The present bridge, constructed in 1968, will be demolished after the completion of the new one. This, however, is a part of a separate contract.
Project data
Challenges / Specifics of the project
- Difficult weather conditions for construction work, wind-exposed area
- Use of a special type of foundation in the sea
- Sea embankments
- A remote location and complex logistics
Galleri
E39 Lønset-Hjelset
More information
E8 Sørbotn-Laukslett
More information
New metro line Akalla-Barkarby, Sweden
More information